Example of the Auger Rod failure [SA-20]

パッケージ画像
Product number: SA-20
Dealers: 想アーキテクツ
File: mp4
Replay time: About 1 minute

Please select the distribution format

120JPY
お気に入り登録
Supported devices

Product Information

Problems that plague the field in pile construction is underground obstacles, such as on a Boulder.

Contains the corruption examples of Rod seemed bored pile PHC with this content per vibration occurring in construction by pre-boring process on a large Boulder, and a long continuous load operations. Describes waveform feature hit the underground obstacles and the correlation integral current value and N value of the other.